VISIBLE SOUND
BER --:--:--
VS-P04 NEW BUILD VIENNA, AT SAMPLE ENTRY

Floridsdorf Primary School

A timber primary school with acoustics in the room from the first sketch. Sixteen classrooms that are calm without feeling dead.

CLIENT
Municipality
TYPE
New build
FOCUS
Room acoustics, insulation
SIZE
16 classrooms
STATUS
Under construction, 2026
LOCATION
48.26°N 16.40°E
FIG.MEASUREDT 0.95 S → 0.55 S (CLASSROOM AVG)
CLASSROOM REVERBERATION (S): FIRST SCHEME VS FINAL BEFOREAFTER
0.0 0.3 0.6 0.9 1.2 125 250 500 1K 2K 4K TARGET 0.6
P04NOTES
01

Brief

Cross-laminated timber is warm and beautiful, but bare timber rooms are loud and timber floors carry footsteps. The architects wanted the structure exposed wherever they could.

02

Approach

We joined at concept stage, so the ceiling absorption could be built into the timber panels instead of hung beneath them. Floor build-ups were tested for footstep noise before any were specified. Teachers sat in on listening sessions and heard a full class at work in the proposed room.

03

Outcome

Every classroom is predicted to meet its reverberation target with timber visible on most surfaces. The school opens in autumn 2027.

NEXTVS-P01ALL PROJECTS
Aula Lecture Theatre